Skip to navigation

Removes a thumbsup from a comment

Unlike a comment that was previously liked

Authentication

AuthorizationBearer

Bearer authentication of the form Bearer <token>, where token is your auth token.

Path parameters

commentIdstringRequiredformat: "uuid"
the id of the comment

Headers

x-integration-namestringOptional
The name of the calling system passed along as a header parameter

Response

Success
errorobject or nullOptional
If the API call failed, this will contain information about the error that occurred.
successbooleanOptionalRead-only

True if the API call succeeded; false otherwise.

hasErrorbooleanOptionalRead-only
True if the API call failed.
statusCodeenumOptional
The HTTP code of the response.