API Patch Notes
October, 2026
Patch notes for 2026.164.201
These patch notes summarize the changes from version 2026.163.296.
Added 13 new endpoints:
- Country.ListCountries
- Country.GetStates
- Holidays.ListHolidays
- Holidays.CreateHolidays
- Holidays.RetrieveHoliday
- Holidays.UpdateHolidayName
- Holidays.DeleteHoliday
- Npt.GetNptTime
- ProjectField.UpdateProjectFieldDefinition
- ProjectField.UpdateProjectFieldOptions
- ProjectMembers.AddTeamToProject
- Task.UpdateApprovalStatus
- Task.RetrieveTaskTimeAllocations
Renamed 12 endpoints:
- Renamed Changeset.RetrieveChangesetStatus to Changeset.RetrieveChangeset
- Renamed Changeset.RetrieveCompletedChangesetStatus to Changeset.RetrieveCompletedChangeset
- Renamed File.DownloadAThumbnailImage to File.DownloadThumbnailImage
- Renamed NptDiscussion.LikeAComment to NptDiscussion.LikeNptComment
- Renamed NptDiscussion.RemovesAThumbsupFromAComment to NptDiscussion.UnlikeNptComment
- Renamed NptDiscussion.RemoveAComment to NptDiscussion.RemoveComment
- Renamed NptFiles.UploadFileToNonProjectTasks to NptFiles.UploadNptFile
- Renamed ProjectMembers.RetrieveProjectsTheUserIsAMemberOf to ProjectMembers.RetrieveProjectsByUser
- Renamed ProjectMembers.CreateOrUpdateUserProjectMembership to ProjectMembers.CreateOrUpdateProjectMembership
- Renamed Task.FetchTheFirstLevelChildTasksFromTheTask to Task.RetrieveFirstLevelChildTasks
- Renamed Task.MarkTaskAsReadForTheCurrentUser to Task.MarkTaskRead
- Renamed Teams.RetrieveZipFileForTeamsIntegrations to Teams.RetrieveIntegrationBundle
Changes to data models:
- IntegrationProviderDto: Added new field
timeSyncDirection - TimesheetAdminTypeDto: Added new field
providerShortId
Patch notes for 2026.163.309
These patch notes summarize the changes from version 2026.163.296.
Changes to data models:
- IntegrationProviderDto: Added new field
includeCosts
September, 2026
Patch notes for 2026.163.296
These patch notes summarize the changes from version 2026.162.255.
Added 5 new endpoints:
- TaskLink.CreateTaskLink
- TaskLink.UpdateTaskLink
- TaskLink.DeleteTaskLink
- TaskLink.RetrieveTaskLinks
- Workload.QueryResourceWorkload
Patch notes for 2026.162.255
These patch notes summarize the changes from version 2026.161.148.
Changes to data models:
- TaskOwnerDto: Added new field
name - TaskOwnerDto: Added new field
shortName - WorkSpaceUserInfoDto: Added new field
workSpacePricingType - WorkSpaceUserInfoDto: Added new field
workSpaceHasScheduledChanges - WorkSpaceUserInfoDto: Added new field
workspaceCurrencySymbol - WorkSpaceUserInfoDto: Added new field
workspaceCurrency
August, 2026
Patch notes for 2026.161.148
These patch notes summarize the changes from version 2026.160.203.
Added 1 new endpoints:
Changes to data models:
- MeetingUpdateDto: Added new field
breakRecurrency - NptUpdateDto: Added new field
breakRecurrency - TaskUpdateDto: Added new field
breakRecurrency
Deprecated 1 old endpoints:
- Risk.CreateProjectRisk
Patch notes for 2026.160.203
These patch notes summarize the changes from version 2026.159.210.
Added 3 new endpoints:
Renamed 8 endpoints:
- Renamed Meetings.CreateWeeklyRecurringMeetings to MeetingRecurrency.CreateWeeklyRecurringMeetings
- Renamed Meetings.CreateMonthlyRecurringMeetings to MeetingRecurrency.CreateMonthlyRecurringMeetings
- Renamed Meetings.CreateDailyRecurringMeetings to MeetingRecurrency.CreateDailyRecurringMeetings
- Renamed Meetings.CreateYearlyRecurringMeetings to MeetingRecurrency.CreateYearlyRecurringMeetings
- Renamed Meetings.DeleteRecurringMeetings to MeetingRecurrency.DeleteRecurringMeetings
- Renamed Meetings.ValidateRecurringMeetingSettings to MeetingRecurrency.ValidateRecurringMeetingSettings
- Renamed Meetings.UpdateRecurringMeetingSettings to MeetingRecurrency.UpdateRecurringMeetingSettings
- Renamed ResourceTeam.RetrieveResourceTeams to ResourceTeam.QueryResourceTeams
Changes to data models:
- RecurringTaskChangeSetDetails: Added new field
recurrences
July, 2026
Patch notes for 2026.159.210
These patch notes summarize the changes from version 2026.158.269.
Changes to data models:
- WorkSpaceDto: Added new field
accountOwnerId - WorkSpaceDto: Added new field
status - WorkSpaceDto: Added new field
isActive - WorkSpaceDto: Added new field
isReseller - WorkSpaceDto: Added new field
licenses - WorkSpaceUserInfoDto: Added new field
isSocial
June, 2026
Patch notes for 2026.158.269
These patch notes summarize the changes from version 2026.157.126.
Added 1 new endpoints:
Renamed 3 endpoints:
- Renamed ProjectMembers.UpdateUserProjectMembership to ProjectMembers.CreateOrUpdateUserProjectMembership
- Renamed WorkSpace.RetrieveTheCurrentWorkspace to WorkSpace.RetrieveCurrentWorkspace
- Renamed WorkSpace.UpdateSettingsForTheCurrentWorkspace to WorkSpace.UpdateCurrentWorkspaceSettings
Changes to data models:
- IntegrationDto: Removed field
metadata - ResourceDto: Added new field
roleId - UserRolePermissionsDto: Added new field
useMcp - WorkSpacePermissionsDto: Added new field
changeOwnEmail - WorkSpacePermissionsDto: Added new field
useMcp
Deprecated 2 old endpoints:
- ProjectMembers.UpdateAListOfUserProjectMembership
- ProjectMembers.CreateUserProjectMembership
Patch notes for 2026.157.126
These patch notes summarize the changes from version 2026.156.163.
Added 2 new endpoints:
Renamed 1 endpoints:
- Renamed WorkSpace.RetrieveWorkspaces to WorkSpace.RetrieveTheCurrentWorkspace
Changes to data models:
- IntegrationDto: Added new field
metadata - IntegrationProviderDto: Added new field
unauthorized - TaskDetailsDto: Added new field
baseline - WorkSpaceDto: Added new field
settings
Deprecated 3 old endpoints:
- Holiday.QueryResourceHolidays
- Holiday.QueryCountryHolidays
- Holiday.QueryGlobalHolidays
August, 2026
Patch notes for 2026.156.163
These patch notes summarize the changes from version 2026.156.162.
- Minor documentation changes, bugfixes, and performance improvements.
May, 2026
Patch notes for 2026.156.162
These patch notes summarize the changes from version 153.2.193.
Added 12 new endpoints:
- Meetings.GetMeetings
- Npt.GetNpts
- NptStatus.CreateNptTaskStatus
- NptStatus.UpdateNptTaskStatus
- NptStatus.DeleteNptTaskStatus
- Risk.CreateProjectRisk
- Security.ListBusinessRoles
- Security.CreateBusinessRole
- Security.UpdateBusinessRole
- Security.DeleteBusinessRole
- Security.ResendEmailValidation
- Task.MarkTaskAsReadForTheCurrentUser
Changes to existing endpoints:
- ResourceSkill.UpdateResourceSkill changed the parameter name
{skillId}to{resourceSkillId} - ResourceSkill.UpdateResourceSkill added path parameter
resourceSkillId - ResourceSkill.UpdateResourceSkill removed path parameter
skillId - ResourceTeam.UpdateResourceTeam changed the parameter name
{teamresourceId}to{resourceTeamId} - ResourceTeam.UpdateResourceTeam added path parameter
resourceTeamId - ResourceTeam.UpdateResourceTeam removed path parameter
teamresourceId - Deprecated and replaced: The previous version of TaskStatus.UpdateTaskStatus was deprecated and replaced with a new method.
- TaskStatus.UpdateTaskStatus added path parameter
taskStatusId - TaskStatus.UpdateTaskStatus removed path parameter
projectId - Deprecated and replaced: The previous version of TaskStatus.DeleteTaskStatus was deprecated and replaced with a new method.
- TaskStatus.DeleteTaskStatus removed path parameter
projectId
Changes to data models:
- MeetingUpdateDto: Added new field
moveToProject - NptUpdateDto: Added new field
moveToProject - ResourceCreateDto: Added new field
defaultPlannedHours - ResourceCreateDto: Added new field
workingDays - ResourceDto: Added new field
defaultPlannedHours - ResourceDto: Added new field
workingDays - ResourceUpdateDto: Added new field
defaultPlannedHours - ResourceUpdateDto: Added new field
workingDays - RiskUpdateDto: Added new field
moveToProject - TaskDetailsDto: Changed the data type of the field
fieldValuesfromTaskFieldValueDtotoSimpleTaskFieldValueDto - TaskDto: Changed the data type of the field
fieldValuesfromTaskFieldValueDtotoSimpleTaskFieldValueDto - TaskFileDto: Added new field
size - TaskStatusUpdateDto: Removed field
id - TaskUpdateDto: Added new field
moveToProject - WorkSpaceUserInfoDto: Added new field
entitlements
Deprecated 3 old endpoints:
- Risk.CreateRisk
- TaskStatus.UpdateTaskStatus
- TaskStatus.DeleteTaskStatus
April, 2026
Patch notes for 153.2.193
These patch notes summarize the changes from version 152.0.138.
Added 2 new endpoints:
Changes to data models:
- ProjectMemberDto: Added new field
projectId - TagUpdateDto: Added new field
name - WorkSpaceUserInfoDto: Added new field
workspaceCulture - WorkSpaceUserInfoDto: Added new field
workspaceCurrencyCulture - WorkSpaceUserInfoDto: Removed field
workSpaceCulture - WorkSpaceUserInfoDto: Removed field
workSpaceCurrencyCulture
Patch notes for 152.0.138
These patch notes summarize the changes from version 151.0.100.
Added 16 new endpoints:
- Me.RemoveMyAvatar
- MeetingTag.ReplaceMeetingTags
- MeetingTag.AddTagsToMeeting
- MeetingTag.RemoveTagsFromMeeting
- MeetingTag.RetrieveTagsForAMeeting
- MeetingTodos.GetMeetingTodos
- MeetingTodos.CreateMeetingTodos
- MeetingTodos.UpdateAMeetingTodos
- MeetingTodos.RemoveMeetingTodos
- ProjectPriority.CreateProjectPriority
- ProjectPriority.UpdateProjectPriority
- ProjectPriority.DeleteProjectPriority
- RiskTag.ReplaceRiskTags
- RiskTag.AddTagsToRisk
- RiskTag.RemoveTagsFromRisk
- RiskTag.RetrieveTagsForARisk
Changes to data models:
- CountryDto: Added new field
countryId - CountryDto: Added new field
cultureName - HourlyRateDetailsDto: Removed field
isActive - HourlyRateDto: Removed field
isActive - ResourceCreateDto: Added new field
publicAvatarId - ResourceUpdateDto: Added new field
publicAvatarId - ResourceUpdateDto: Added new field
clearAvatar - RiskCreateDto: Added new field
riskTypeId - TaskFileDto: Added new field
createDate - TaskFileDto: Added new field
fileType - TaskFileDto: Added new field
fileTypeLabel - WorkSpaceUserInfoDto: Added new field
workSpaceCulture - WorkSpaceUserInfoDto: Added new field
workSpaceCurrencyCulture - WorkSpaceUserInfoDto: Added new field
userCulture - WorkSpaceUserInfoDto: Added new field
userCurrencyCulture
March, 2026
Patch notes for 151.0.100
These patch notes summarize the changes from version 149.0.187.
Changes to data models:
- ResourceDto: Added new field
resourceTypeId
February, 2026
Patch notes for 149.0.187
These patch notes summarize the changes from version 148.0.136.
Added 13 new endpoints:
- HourlyRate.CreateHourlyRate
- HourlyRate.GetHourlyRates
- HourlyRate.UpdateHourlyRate
- HourlyRate.GetHourlyRate
- HourlyRate.DeleteHourlyRate
- HourlyRate.UpdateHourlyRateValue
- HourlyRatePeriod.GetRatePeriods
- HourlyRatePeriod.CreateRatePeriod
- Risk.GetRisk
- Risk.UpdateRisk
- Risk.RemoveRisk
- Risk.GetRisksForProject
- Risk.CreateRisk
Changes to data models:
- MeetingDetailsDto: Added new field
project - MeetingDto: Added new field
project - RiskDto: Changed the data type of the field
assignmentsfromAssignmentDtotoRiskAssignmentDto - RiskDto: Added new field
project
January, 2026
Patch notes for 148.0.136
These patch notes summarize the changes from version 146.1.229.
Added 11 new endpoints:
- Meetings.GetMeeting
- Meetings.UpdateMeeting
- Meetings.RemoveMeeting
- Meetings.CreateMeeting
- Meetings.CreateWeeklyRecurringMeetings
- Meetings.CreateMonthlyRecurringMeetings
- Meetings.CreateDailyRecurringMeetings
- Meetings.CreateYearlyRecurringMeetings
- Meetings.DeleteRecurringMeetings
- Meetings.ValidateRecurringMeetingSettings
- Meetings.UpdateRecurringMeetingSettings
Updates from 2025
Patch notes for 146.1.229
These patch notes summarize the changes from version 145.0.219.
Changes to data models:
- IntegrationDto: Removed field
config - ProjectDto: Added new field
workingDays - ProjectStatusDto: Added new field
isSystem - ProjectVersionDto: Added new field
applicationName - ProjectVersionDto: Added new field
tokenId - ProjectVersionDto: Added new field
tokenName
Patch notes for 145.0.219
These patch notes summarize the changes from version 144.0.155.
Added 11 new endpoints:
- NptRecurrency.ValidateRecurringNpts
- NptRecurrency.UpdateRecurringNpts
- ProjectChargeCode.UpdateProjectChargeCode
- ProjectChargeCode.DeleteProjectChargeCode
- ProjectFolder.CreateProjectFolder
- ProjectFolder.UpdateProjectFolder
- ProjectFolder.DeleteProjectFolder
- ProjectStatus.UpdateProjectStatus
- ProjectStatus.DeleteProjectStatus
- TaskRecurrency.ValidateRecurringTasks
- TaskRecurrency.UpdateRecurringTasks
Renamed 5 endpoints:
- Renamed Timesheet.QueryTimeSheets to Timesheet.QueryTimeEntries
- Renamed Timesheet.ReturnsActiveAdminTasksThatAreUsedToReportTime to Timesheet.RetrieveAdministrativeTasks
- Renamed Timesheet.SubmitResourceTimeSheetForApproval to Timesheet.SubmitTimeSheet
- Renamed Timesheet.ApproveResourceTimeSheetApprovalRequest to Timesheet.ApproveTimeSheet
- Renamed Timesheet.RejectResourceTimeSheetApprovalRequest to Timesheet.RejectTimeSheet
Changes to data models:
- ProjectDto: Added new field
ownerId - TaskCreateDto: Added new field
index
Patch notes for 144.0.155
These patch notes summarize the changes from version 143.0.162.
Added 2 new endpoints:
Changes to data models:
- ProjectChargeCodeDto: Added new field
isActive - ProjectTemplateDto: Added new field
ownerId - ProjectTemplateDto: Added new field
createDate - TimesheetDto: Added new field
approvalStatusId - UserRoleDto: Added new field
description - UserRoleDto: Added new field
isAdmin - UserRoleDto: Added new field
isCustom - UserRoleDto: Added new field
isGlobalAdmin - UserRoleDto: Added new field
isGuest - UserRoleDto: Added new field
isDefault - UserRoleDto: Added new field
permissions
Patch notes for 143.0.162
These patch notes summarize the changes from version 141.1.156.
Added 7 new endpoints:
- NptRecurrency.CreateWeeklyRecurringNpts
- NptRecurrency.CreateMonthlyRecurringNpts
- NptRecurrency.CreateDailyRecurringNpts
- NptRecurrency.CreateYearlyRecurringNpts
- NptRecurrency.DeleteRecurringNpts
- Task.FetchTheFirstLevelChildTasksFromTheTask
- TaskAssignee.ReturnsTaskAssignees
Changes to data models:
- NptCreateDto: Added new field
statusId - NptDetailsDto: Added new field
createDate - NptDetailsDto: Added new field
owner - NptDetailsDto: Added new field
ownerId - NptDetailsDto: Added new field
discussionData - NptDetailsDto: Added new field
fileData - NptDetailsDto: Added new field
recurring - NptDetailsDto: Added new field
recurringParentTaskId - NptDetailsDto: Added new field
recurringSettings - NptDto: Added new field
createDate - NptDto: Added new field
owner - NptDto: Added new field
ownerId - NptUpdateDto: Added new field
plannedDuration - NptUpdateDto: Added new field
plannedEffort - NptUpdateDto: Added new field
actualDuration - NptUpdateDto: Added new field
recurring - ProjectCreateDto: Added new field
weekStartsOnMonday - RecurringTaskChangeSetDetails: Added new field
changeSetId - TaskDetailsDto: Added new field
ownerId - TaskDetailsDto: Added new field
owner - TaskDetailsDto: Added new field
recurring - TaskDetailsDto: Added new field
recurringParentTaskId - TaskDetailsDto: Added new field
recurringSettings - TaskDetailsDto: Added new field
approvalStatus - TaskDetailsDto: Added new field
approvalStatusModifiedBy - TaskDetailsDto: Added new field
approvalStatusModifiedDate - TaskDetailsDto: Added new field
approvalLastReminderDate - TaskDetailsDto: Added new field
discussionData - TaskDetailsDto: Added new field
fileData - TaskDetailsDto: Added new field
successors - TaskDetailsDto: Added new field
predecessors - TaskUpdateDto: Added new field
actualDuration
Patch notes for 141.1.156
These patch notes summarize the changes from version 139.0.157.
Added 6 new endpoints:
- Project.RestoreProject
- TaskRecurrency.CreateWeeklyRecurringTasks
- TaskRecurrency.CreateMonthlyRecurringTasks
- TaskRecurrency.CreateDailyRecurringTasks
- TaskRecurrency.CreateYearlyRecurringTasks
- TaskRecurrency.DeleteRecurringTasks
Changes to data models:
- ProjectCreateDto: Added new field
template
Patch notes for 139.0.157
These patch notes summarize the changes from version 138.1.170.
Added 2 new endpoints:
Changes to data models:
- NptDetailsDto: Added new field
actualStartDate - NptDetailsDto: Added new field
actualFinishDate - NptDetailsDto: Added new field
actualDuration - NptDetailsDto: Added new field
actualCost - NptDetailsDto: Added new field
plannedCost - NptDetailsDto: Added new field
plannedDuration - NptDetailsDto: Added new field
plannedEffort - NptDetailsDto: Added new field
tags - NptDetailsDto: Added new field
todos - NptDto: Added new field
actualStartDate - NptDto: Added new field
actualFinishDate - NptDto: Added new field
actualDuration - NptDto: Added new field
actualCost - NptDto: Added new field
plannedCost - NptDto: Added new field
plannedDuration - NptDto: Added new field
plannedEffort - NptDto: Added new field
tags - NptDto: Added new field
todos - NptUpdateDto: Added new field
actualStartDate - NptUpdateDto: Added new field
actualFinishDate - NptUpdateDto: Added new field
plannedCost - NptUpdateDto: Added new field
actualCost - ProjectCreateDto: Added new field
externalReferenceId - ProjectDto: Added new field
externalReferenceId - ProjectUpdateDto: Added new field
externalReferenceId - TaskDetailsDto: Added new field
childTaskCount - TaskDetailsDto: Added new field
parentTaskName - WorkSpaceUserInfoDto: Added new field
workSpaceId - WorkSpaceUserInfoDto: Added new field
workSpaceStatus - WorkSpaceUserInfoDto: Added new field
workSpaceIsActive - WorkSpaceUserInfoDto: Added new field
workSpaceCountry - WorkSpaceUserInfoDto: Added new field
workSpaceCountryCode - WorkSpaceUserInfoDto: Added new field
location
Patch notes for 138.1.170
These patch notes summarize the changes from version 137.0.201.
Added 16 new endpoints:
- NptDiscussion.RetrieveNptComments
- NptDiscussion.CreateNptComments
- NptDiscussion.LikeAComment
- NptDiscussion.RemovesAThumbsupFromAComment
- NptDiscussion.RemoveAComment
- NptFiles.GetNptFiles
- NptTag.ReplaceTaskTags
- NptTag.AddTaskTagToTask
- NptTag.RemoveTaskTagFromTask
- NptTag.RetrieveTaskTags
- NptTodos.GetNptTodos
- NptTodos.CreateNptTodo
- NptTodos.UpdateANptTodo
- NptTodos.RemoveNptTodo
- TaskFile.GetTaskFiles
- TaskTag.RetrieveTaskTags
Renamed 4 endpoints:
- Renamed Discussion.CreateTaskComments to Discussion.CreateTaskComment
- Renamed Discussion.LikeAComment to Discussion.LikeComment
- Renamed Discussion.RemovesAThumbsupFromAComment to Discussion.UnlikeComment
- Renamed Discussion.RemoveAComment to Discussion.RemoveComment
Changes to data models:
- ProjectManagerDto: Added new field
color - ResourceCreateDto: Added new field
language - ResourceDto: Added new field
name - ResourceDto: Added new field
language - ResourceUpdateDto: Added new field
language - TaskCreateDto: Added new field
parentId
Patch notes for 137.0.201
These patch notes summarize the changes from version 136.0.106.
Added 1 new endpoints:
Renamed 1 endpoints:
- Renamed Risk.GetRiskList to Risk.QueryRisks
Patch notes for 136.0.106
These patch notes summarize the changes from version 135.0.134.
Changes to data models:
- RiskDto: Added new field
riskTypeId - TimeSheetApprovalResponseDto: Added new field
modifiedDate - TimesheetResponseDto: Changed the data type of the field
lastUpdatedDatefromstringtodate-time - TimesheetResponseDto: Added new field
documents - TimesheetUpdateRequestDto: Added new field
documentIds
Patch notes for 135.0.134
These patch notes summarize the changes from version 134.0.125.
Added 1 new endpoints:
Changes to existing endpoints:
- Npt.GetNpt changed the data type of the parameter
nptIdfromuuidtostring
Changes to data models:
- NptDto: Added new field
shortId - TimesheetResponseDto: Added new field
lastUpdatedDate
Patch notes for 134.0.125
These patch notes summarize the changes from version 133.1.136.
Added 3 new endpoints:
- Timesheet.SubmitResourceTimeSheetForApproval
- Timesheet.ApproveResourceTimeSheetApprovalRequest
- Timesheet.RejectResourceTimeSheetApprovalRequest
Changes to data models:
- ProjectCreateDto: Added new field
shortId - TaskDto: Added new field
actualDuration
Patch notes for 133.1.136
These patch notes summarize the changes from version 132.1.183.
Changes to data models:
- TaskDto: Added new field
index - TaskDto: Added new field
level - TimesheetDto: Added new field
isCopied - TimesheetResponseDto: Added new field
isCopied
Patch notes for 132.1.183
These patch notes summarize the changes from version 131.1.208.
Added 1 new endpoints:
Changes to data models:
- ProjectUpdateDto: Added new field
notes
Patch notes for 131.1.208
These patch notes summarize the changes from version 130.1.162.
Changes to data models:
- ProjectCreateDto: Added new field
shortName - ProjectCreateDto: Added new field
updatePlannedWithActual - ProjectCreateDto: Added new field
workingDays - ProjectDto: Added new field
updatePlannedWithActual - ProjectUpdateDto: Added new field
shortName - ProjectUpdateDto: Added new field
updatePlannedWithActual - ResourceSkillDto: Added new field
inUse
Patch notes for 130.1.162
These patch notes summarize the changes from version 129.0.113.
Added 1 new endpoints:
Changes to data models:
- ProjectCreateDto: Removed field
template - ProjectUpdateDto: Added new field
template
Patch notes for 129.0.113
These patch notes summarize the changes from version 127.0.185.
Added 6 new endpoints:
Renamed 4 endpoints:
- Renamed TaskTodo.GetTodosForATask to TaskTodo.GetTodos
- Renamed TaskTodo.CreateATodoForATask to TaskTodo.CreateTodo
- Renamed TaskTodo.UpdateATodo to TaskTodo.UpdateTodo
- Renamed TaskTodo.DeleteATodo to TaskTodo.DeleteTodo
Changes to data models:
- TimesheetDto: Changed the data type of the field
datefromdate-timetodate - TimesheetTaskDto: Changed the data type of the field
plannedStartDatefromdate-timetodate - TimesheetTaskDto: Changed the data type of the field
plannedFinishDatefromdate-timetodate - TimesheetTaskDto: Changed the data type of the field
actualStartDatefromdate-timetodate - TimesheetTaskDto: Changed the data type of the field
actualFinishDatefromdate-timetodate
Patch notes for 127.0.185
These patch notes summarize the changes from version 125.1.169.
Changes to data models:
- LicenseDto: Changed the data type of the field
idfromuuidtostring
Patch notes for 125.1.169
These patch notes summarize the changes from version 122.0.214.
Changes to data models:
- WorkSpaceUserInfoDto: Added new field
permissions
Updates from 2024
Patch notes for 122.0.214
These patch notes summarize the changes from version 121.0.4887.
Added 3 new endpoints:
- ProjectCustomer.CreateProjectCustomer
- ProjectCustomer.UpdateProjectCustomer
- ProjectCustomer.DeleteProjectCustomer
Patch notes for 121.0.4887
These patch notes summarize the changes from version 120.0.4689.
Added 7 new endpoints:
- Discussion.LikeAComment
- Discussion.RemovesAThumbsupFromAComment
- Discussion.RemoveAComment
- TaskTodo.GetTodosForATask
- TaskTodo.CreateATodoForATask
- TaskTodo.UpdateATodo
- TaskTodo.DeleteATodo
Changes to existing endpoints:
- Notification.RetrieveNotifications added query parameter
senderId - Notification.RetrieveNotifications added query parameter
notificationTypes - Notification.RetrieveNotifications added query parameter
asFlatList
Changes to data models:
- ResourceDto: Added new field
countryName - TaskCreateDto: Added new field
isLocked - TaskCreateDto: Added new field
isMilestone - TaskUpdateDto: Added new field
isLocked - TaskUpdateDto: Added new field
isMilestone - TimesheetCreateRequestDto: Added new field
minutes - TimesheetDto: Added new field
minutes - TimesheetResponseDto: Added new field
minutes - TimesheetUpdateRequestDto: Added new field
minutes
Patch notes for 120.0.4689
These patch notes summarize the changes from version 119.0.4625.
Changes to data models:
- ResourceDto: Added new field
initials - ResourceDto: Added new field
avatarUrl
Patch notes for 119.0.4625
These patch notes summarize the changes from version 117.0.4438.
Added 5 new endpoints:
- ProjectVersion.RetrieveProjectVersions
- ProjectVersion.DownloadMSProjectXml
- ProjectVersion.RestoreProjectVersion
- ProjectVersion.CopyProjectVersion
- Risk.CreateRiskExport
Renamed 1 endpoints:
- Renamed TaskMetadata.GetTasksByProjectIDAndForeignKeyID to TaskMetadata.TaskMetadataSearch
Changes to data models:
- TaskDto: Added new field
isLocked - TaskDto: Added new field
isMilestone
Patch notes for 117.0.4438
These patch notes summarize the changes from version 116.0.4391.
Changes to data models:
- ResourceCreateDto: Added new field
colorName - ResourceDto: Added new field
colorName - ResourceDto: Added new field
color - ResourceUpdateDto: Added new field
colorName
Patch notes for 116.0.4391
These patch notes summarize the changes from version 115.0.4330.
Added 1 new endpoints:
Changes to data models:
- TimesheetDto: Added new field
resourceId - TimesheetDto: Added new field
taskId - TimesheetDto: Added new field
projectId - UserError: Added new field
statusCode
Patch notes for 115.0.4330
These patch notes summarize the changes from version 114.0.4169.
Changes to data models:
- NotificationDto: Added new field
id - NotificationDto: Removed field
notificationId - NotificationDto: Removed field
businessId - NotificationDto: Removed field
userId - ResourcesCreateDto: Added new field
projectIds - RiskExportSettingsDto: Added new field
timeZoneOffset - RiskExportSettingsDto: Added new field
dueDateFilter - RiskExportSettingsDto: Added new field
priorityFilter - RiskExportSettingsDto: Added new field
progressFilter - RiskExportSettingsDto: Added new field
assignees - RiskExportSettingsDto: Added new field
tags - TaskDto: Added new field
theme
Patch notes for 114.0.4169
These patch notes summarize the changes from version 112.0.3856.
Added 9 new endpoints:
- Notification.RetrieveNotifications
- Notification.NotificationCount
- Notification.UnreadNotificationCount
- Notification.DeleteAllNotifications
- Notification.MarkNotificationRead
- Notification.ReadAllNotifications
- Notification.DeleteNotification
- Notification.MarkNotificationUnread
- Resource.CreateManyResources
Changes to data models:
- ProjectVersionChangeDataDto: Added new field
restoreVersion - ResourceDto: Added new field
createdDate - ResourceDto: Added new field
createdBy - ResourceDto: Added new field
modifiedDate - ResourceDto: Added new field
modifiedBy - ResourceUpdateDto: Added new field
isActive - ResourceUpdateDto: Added new field
approverId - TaskUpdateDto: Added new field
actualFinishDate
Patch notes for 112.0.3856
These patch notes summarize the changes from version 110.0.3705.
Changes to data models:
- AstroError: Added new field
validationErrors - IntegrationDto: Added new field
noAdminPermission - ProjectCreateDto: Added new field
taskStatusCreate - ProjectDto: Added new field
percentComplete - TaskStatusCreateDto: Added new field
isDone
Patch notes for 110.0.3705
These patch notes summarize the changes from version 107.0.3368.
Changes to data models:
- CountryHolidayDto: Added new field
countryName
Patch notes for 107.0.3368
These patch notes summarize the changes from version 104.0.3086.
Changes to data models:
- TaskDto: Added new field
actualEffort - TaskDto: Added new field
actualResourceCost - TaskDto: Added new field
plannedResourceCost - TimesheetResourceDto: Added new field
hourlyRate - TimesheetTaskDto: Added new field
actualResourceCost - TimesheetTaskDto: Added new field
actualEffort - TimesheetTaskDto: Added new field
plannedResourceCost - TimesheetTaskDto: Added new field
plannedEffort
Patch notes for 104.0.3086
These patch notes summarize the changes from version 103.0.3003.
Added 1 new endpoints:
Renamed 2 endpoints:
- Renamed Changeset.RetrieveChangeset to Changeset.RetrieveChangesetStatus
- Renamed Changeset.RetrieveCompletedChangeset to Changeset.RetrieveCompletedChangesetStatus
Deprecated 1 old endpoints:
- Changeset.RetrieveChangesetsByProjectID
Patch notes for 103.0.3003
These patch notes summarize the changes from version 102.0.2886.
Added 2 new endpoints:
Changes to data models:
- ProjectFileDto: Added new field
folder
Patch notes for 102.0.2886
These patch notes summarize the changes from version 99.0.2550.
Added 9 new endpoints:
- File.DeleteFile
- Holiday.QueryResourceHolidays
- Holiday.QueryCountryHolidays
- Holiday.QueryGlobalHolidays
- IntegrationProvider.DisconnectUserIntegrationProviderConnection
- NptFiles.UploadFileToNonProjectTasks
- TaskMetadata.AddMetadata
- TaskMetadata.GetTaskMetadata
- TaskMetadata.GetTasksByProjectIDAndForeignKeyID
Changes to existing endpoints:
- Project.QueryProjects removed query parameter
$select - Resource.QueryResources removed query parameter
$select - ResourceSkill.RetrieveResourceSkills removed query parameter
$select - ResourceTeam.RetrieveResourceTeams removed query parameter
$select - Tag.QueryTags removed query parameter
$select - Task.QueryTasks removed query parameter
$select - TaskField.QueryTaskFields removed query parameter
$select - TaskField.QueryTaskFieldValues removed query parameter
$select - Timesheet.QueryTimeSheets removed query parameter
$select
Changes to data models:
- ProjectDto: Added new field
creationTemplateId - ProjectDto: Added new field
fieldValues - ProjectDto: Added new field
files - TaskAssigneeDto: Added new field
email - TaskAssigneeDto: Added new field
allocatedEffort - TaskDto: Added new field
fieldValues - TaskDto: Added new field
files - TaskFieldValueDto: Added new field
name - TaskFieldValueDto: Added new field
type - TimesheetDto: Added new field
files
Deprecated 2 old endpoints:
- Discussion.RetrieveTaskComments
- Discussion.CreateTaskComments
Patch notes for 99.0.2550
These patch notes summarize the changes from version 98.0.2363.
Added 2 new endpoints:
Renamed 2 endpoints:
- Renamed ProjectField.UpdateProjectField to ProjectField.UpdateProjectFieldValue
- Renamed ProjectMembers.RetrieveUserProjectMemberShip to ProjectMembers.RetrieveUserProjectMembership
Changes to existing endpoints:
- Breaking change: ProjectField.DeleteProjectField path changed from
/api/data/projects/fieldsto/api/data/projects/fields/{fieldId} - ProjectField.DeleteProjectField added path parameter
fieldId - ProjectField.DeleteProjectField removed body parameter
body - ProjectField.UpdateProjectFieldValue changed the data type of the parameter
fieldIdfromuuidtostring - ProjectField.RetrieveProjectFieldValue changed the data type of the parameter
fieldIdfromuuidtostring - Deprecated and replaced: The previous version of TaskField.RetrieveTaskFieldValue was deprecated and replaced with a new method.
- Deprecated and replaced: The previous version of TaskField.UpdateTaskFieldValue was deprecated and replaced with a new method.
Changes to data models:
- ConnectionSchemaDto: Added new field
connected - GetProjectFieldsResponseDto: Added new field
shortId - IntegrationDto: Added new field
autoEnabled - IntegrationProviderDto: Added new field
createInWorkato - ProjectFieldsValueResponseDto: Added new field
shortId - ProjectFieldsValueResponseDto: Added new field
createdDate - ProjectFieldsValueResponseDto: Added new field
modifiedDate - TaskDto: Changed the data type of the field
fieldsfromTaskFieldDtotoTaskFieldValueDto - TaskFieldDto: Added new field
id - TaskFieldDto: Added new field
name - TaskFieldDto: Added new field
type - TaskFieldDto: Added new field
options - TaskFieldDto: Added new field
project - TaskFieldDto: Added new field
createdDate - TaskFieldDto: Added new field
modifiedDate - TaskFieldDto: Removed field
value - TimesheetDto: Added new field
adminType - WorkSpaceUserInfoDto: Added new field
roleName - WorkSpaceUserInfoDto: Added new field
isGlobalAdmin - WorkSpaceUserInfoDto: Added new field
isAccountAdministrator
Patch notes for 98.0.2363
These patch notes summarize the changes from version 97.0.2178.
Added 2 new endpoints:
Changes to existing endpoints:
- ApiKey.CreateApiKey added header parameter
x-integration-name - ApiKey.ListApiKeys added header parameter
x-integration-name - ApiKey.RevokeAllApiKeys added header parameter
x-integration-name - ApiKey.RevokeAPIKey added header parameter
x-integration-name - Changeset.RetrieveChangeset added header parameter
x-integration-name - Changeset.RetrieveCompletedChangeset added header parameter
x-integration-name - Dashboard.RetrieveDashboardUserSettings added header parameter
x-integration-name - Dashboard.CreateOrUpdateUserDashboardSettings added header parameter
x-integration-name - Discussion.RetrieveTaskComments added header parameter
x-integration-name - Discussion.CreateTaskComments added header parameter
x-integration-name - File.DownloadFile added header parameter
x-integration-name - File.DownloadAThumbnailImage added header parameter
x-integration-name - File.UpdateFile added header parameter
x-integration-name - HomeFile.UploadHomeFile added header parameter
x-integration-name - HomeFile.UploadHomeFileToFolder added header parameter
x-integration-name - Integration.RetrieveIntegration added header parameter
x-integration-name - Integration.EnableIntegration added header parameter
x-integration-name - Integration.DisableIntegration added header parameter
x-integration-name - Integration.RetrieveAllIntegrations added header parameter
x-integration-name - IntegrationCategory.RetrieveProviderCategories added header parameter
x-integration-name - IntegrationProvider.ListProviders added header parameter
x-integration-name - IntegrationProvider.ActivateIntegrationProvider added header parameter
x-integration-name - IntegrationProvider.UpdateIntegrationProvider added header parameter
x-integration-name - IntegrationProvider.DeactivateIntegrationProvider added header parameter
x-integration-name - IntegrationProvider.CreateUserIntegrationProviderConnection added header parameter
x-integration-name - IntegrationProvider.UpdateUserIntegrationProviderConnection added header parameter
x-integration-name - License.RetrieveLicenses added header parameter
x-integration-name - License.AddLicense added header parameter
x-integration-name - Me.RetrieveMe added header parameter
x-integration-name - Project.QueryProjects added header parameter
x-integration-name - Project.CreateProject added header parameter
x-integration-name - Project.RetrieveProject added header parameter
x-integration-name - Project.UpdateProject added header parameter
x-integration-name - ProjectChargeCode.RetrieveChargeCodes added header parameter
x-integration-name - ProjectCustomer.RetrieveProjectCustomers added header parameter
x-integration-name - ProjectField.RetrieveProjectFields added header parameter
x-integration-name - ProjectField.CreateProjectField added header parameter
x-integration-name - ProjectField.DeleteProjectField added header parameter
x-integration-name - ProjectField.UpdateProjectField added header parameter
x-integration-name - ProjectFile.UploadProjectFile added header parameter
x-integration-name - ProjectFile.UploadProjectFileToFolder added header parameter
x-integration-name - ProjectFolder.RetrieveProjectFolders added header parameter
x-integration-name - ProjectMembers.RetrieveNewProjectMembers added header parameter
x-integration-name - ProjectMembers.RetrieveProjectMembers added header parameter
x-integration-name - ProjectMembers.RetrieveUserProjectMemberShip added header parameter
x-integration-name - ProjectMembers.CreateUserProjectMembership added header parameter
x-integration-name - ProjectMembers.UpdateUserProjectMembership added header parameter
x-integration-name - ProjectMembers.RemoveUserProjectMembership added header parameter
x-integration-name - ProjectPriority.RetrieveProjectPriorities added header parameter
x-integration-name - ProjectStatus.RetrieveProjectStatuses added header parameter
x-integration-name - ProjectTemplate.RetrieveProjectTemplates added header parameter
x-integration-name - ProjectTemplate.RetrieveTemplateCategories added header parameter
x-integration-name - Resource.CreateResource added header parameter
x-integration-name - Resource.QueryResources added header parameter
x-integration-name - Resource.UpdateResource added header parameter
x-integration-name - Resource.RetrieveResource added header parameter
x-integration-name - ResourceSkill.RetrieveResourceSkills added header parameter
x-integration-name - ResourceSkill.CreateResourceSkill added header parameter
x-integration-name - ResourceSkill.UpdateResourceSkill added header parameter
x-integration-name - ResourceSkill.DeleteResourceSkill added header parameter
x-integration-name - ResourceTeam.RetrieveResourceTeams added header parameter
x-integration-name - ResourceTeam.CreateResourceTeam added header parameter
x-integration-name - ResourceTeam.DeleteResourceTeam added header parameter
x-integration-name - ResourceTeam.UpdateResourceTeam added header parameter
x-integration-name - Tag.QueryTags added header parameter
x-integration-name - Tag.CreateTag added header parameter
x-integration-name - Tag.UpdateTag added header parameter
x-integration-name - Task.QueryTasks added header parameter
x-integration-name - Task.RetrieveTask added header parameter
x-integration-name - Task.UpdateTask added header parameter
x-integration-name - Task.DeleteTask added header parameter
x-integration-name - Task.CreateTask added header parameter
x-integration-name - Task.RetrieveTaskPriorities added header parameter
x-integration-name - Task.CreateManyTasks added header parameter
x-integration-name - Task.AddParentTask added header parameter
x-integration-name - Task.UpdateParentTask added header parameter
x-integration-name - Task.RemoveParentTask added header parameter
x-integration-name - TaskAssignee.ReplaceTaskAssignees added header parameter
x-integration-name - TaskAssignee.CreateOrUpdateTaskAssignee added header parameter
x-integration-name - TaskAssignee.DeleteTaskAssignees added header parameter
x-integration-name - TaskField.RetrieveTaskFields added header parameter
x-integration-name - TaskField.CreateTaskField added header parameter
x-integration-name - TaskField.DeleteTaskField added header parameter
x-integration-name - TaskField.RetrieveTaskFieldValue added header parameter
x-integration-name - TaskField.UpdateTaskFieldValue added header parameter
x-integration-name - TaskField.RetrieveAllTaskFieldValues added header parameter
x-integration-name - TaskFile.UploadTaskFile added header parameter
x-integration-name - TaskStatus.RetrieveTaskStatuses added header parameter
x-integration-name - TaskStatus.CreateTaskStatus added header parameter
x-integration-name - TaskStatus.UpdateTaskStatus added header parameter
x-integration-name - TaskStatus.DeleteTaskStatus added header parameter
x-integration-name - TaskTag.ReplaceTaskTags added header parameter
x-integration-name - TaskTag.AddTaskTagToTask added header parameter
x-integration-name - TaskTag.RemoveTaskTagFromTask added header parameter
x-integration-name - Teams.RetrieveZipFileForTeamsIntegrations added header parameter
x-integration-name - Timesheet.CreateTimeEntry added header parameter
x-integration-name - Timesheet.QueryTimeSheets added header parameter
x-integration-name - Timesheet.DeleteTimeEntry added header parameter
x-integration-name - Timesheet.UpdateTimeEntry added header parameter
x-integration-name - Timesheet.ReturnsActiveAdminTasksThatAreUsedToReportTime added header parameter
x-integration-name - UserRole.RetrieveUserRoles added header parameter
x-integration-name - WorkSpace.RetrieveWorkspaces added header parameter
x-integration-name - WorkSpace.InviteToWorkspace added header parameter
x-integration-name
Changes to data models:
- CreateProjectFieldDto: Added new field
shortId - CreateTaskFieldRequestDto: Added new field
shortId - IntegrationInstanceDto: Added new field
projectId - IntegrationInstanceDto: Added new field
providerItemId - IntegrationInstanceDto: Added new field
providerItemName - IntegrationInstanceDto: Removed field
config - IntegrationProviderDto: Added new field
authSetup - ProjectDto: Changed the data type of the field
startDatefromdate-timetodate - ProjectDto: Changed the data type of the field
endDatefromdate-timetodate - ProjectDto: Changed the data type of the field
plannedStartDatefromdate-timetodate - ProjectDto: Changed the data type of the field
plannedFinishDatefromdate-timetodate - ProjectDto: Changed the data type of the field
actualStartDatefromdate-timetodate - ProjectDto: Changed the data type of the field
actualFinishDatefromdate-timetodate - ProjectDto: Added new field
fields - TaskDetailsDto: Added new field
fields - TaskDto: Added new field
fields - TimesheetDto: Added new field
modifiedDate
Patch notes for 97.0.2178
These patch notes summarize the changes from version 96.0.2123.
Added 3 new endpoints:
Changes to data models:
- ProjectDto: Added new field
plannedStartDate - ProjectDto: Added new field
plannedFinishDate - ProjectDto: Added new field
actualStartDate - ProjectDto: Added new field
actualFinishDate - TaskDto: Added new field
tags - TaskDto: Added new field
todos - TaskDto: Added new field
status - TaskDto: Added new field
plannedDuration - TaskDto: Added new field
plannedEffort