Replace Risk Tags
Replaces the existing tags on a Risk with a newly provided list. A tag is a connection between a Risk and a Tag. Each Risk can have zero, one or many tags.
Authentication
AuthorizationBearer
Bearer authentication of the form Bearer <token>, where token is your auth token.
Path parameters
riskId
The unique identifier of the Risk
Headers
x-integration-name
The name of the calling system passed along as a header parameter
Request
The replacement list of tags for this Risk
name
A name. To determine the meaning of this name, see the field to which this value is attached in the parent object.
Response
Success
error
If the API call failed, this will contain information about the error that occurred.
success
True if the API call succeeded; false otherwise.
hasError
True if the API call failed.
statusCode
The HTTP code of the response.
data
If the API call succeeded, this will contain the results.