Skip to navigation

Retrieve Resource

Retrieve the Resource matching the specified unique ID.

A Resource represents a person, material, or tool that is used within your Projects. When you attach a Resources to more than one Task, the software will schedule the usage of your Resource so that it is not allocated to more than one Task at the same time. The users in your Workspace are also considered Resources. To invite a new User to your Workspace, create a new Resource for that user.

Authentication

AuthorizationBearer

Bearer authentication of the form Bearer <token>, where token is your auth token.

Path parameters

resourceIdstringRequiredformat: "uuid"
The id of the Resource

Headers

x-integration-namestringOptional
The name of the calling system passed along as a header parameter

Response

Success
errorobject or nullOptional
If the API call failed, this will contain information about the error that occurred.
successbooleanOptionalRead-only

True if the API call succeeded; false otherwise.

hasErrorbooleanOptionalRead-only
True if the API call failed.
statusCodeenumOptional
The HTTP code of the response.
dataobjectOptional

An extended view of a Resource returned when retrieving a single Resource.

Includes everything on Astro.Api.Dto.Resources.ResourceDto plus additional profile details that are only surfaced for an individual Resource, such as the Projects the Resource has access to.