Get Npt Files
ProjectManager allows you to store Files connected to other elements of your Workspace such as a Project, a Task, or Home. Files are maintained separately based on the location where the file was stored.
When you upload a File, please allow a few moments for the File to be processed and verified. ProjectManager may reject File uploads that contain problems such as malware. Once a File has completed the upload the process, you may retrieve it using the DownloadFile API. ///
Authentication
AuthorizationBearer
Bearer authentication of the form Bearer <token>, where token is your auth token.
Path parameters
taskId
The reference to the Npt
Headers
x-integration-name
The name of the calling system passed along as a header parameter
Response
Success
error
If the API call failed, this will contain information about the error that occurred.
success
True if the API call succeeded; false otherwise.
hasError
True if the API call failed.
statusCode
The HTTP code of the response.
data
If the API call succeeded, this will contain the results.