Delete Todo

Remove a todo

Path parameters

todoIdstringRequiredformat: "uuid"
the id of the todo

Headers

AuthorizationstringRequired

Bearer authentication of the form Bearer <token>, where token is your auth token.

x-integration-namestringOptional
The name of the calling system passed along as a header parameter

Response

Success
errorobject or null
If the API call failed, this will contain information about the error that occurred.
successboolean or null

True if the API call succeeded; false otherwise.

hasErrorboolean or null
True if the API call failed.
statusCodeenum or null
The HTTP code of the response.