Retrieve UserRoles
Retrieves the list of UserRoles defined within this Workspace.
A UserRole is a name for a privilege level granted to a specific User. The 'Global Admin'
UserRole is granted to the owner of the Workspace, and this UserRole cannot be changed.
You can choose which UserRole applies to a User within your Workspace.
Authentication
AuthorizationBearer
Bearer authentication of the form Bearer <token>
, where token is your auth token.
Headers
x-integration-name
The name of the calling system passed along as a header parameter
Response
Success
error
If the API call failed, this will contain information about the error that occurred.
success
True if the API call succeeded; false otherwise.
hasError
True if the API call failed.
statusCode
The HTTP code of the response.
data
If the API call succeeded, this will contain the results.