Delete Resource Team

The endpoint is used to delete a resource team. Users assigned to this team will no longer be assigned thereafter.

Authentication

AuthorizationBearer

Bearer authentication of the form Bearer <token>, where token is your auth token.

Path Parameters

resourceTeamIdstringRequiredformat: "uuid"
The Id of the team to be removed.

Headers

x-integration-namestringOptional
The name of the calling system passed along as a header parameter

Response

Success
errorobject or null
If the API call failed, this will contain information about the error that occurred.
successboolean or null

True if the API call succeeded; false otherwise.

hasErrorboolean or null
True if the API call failed.
statusCodeenum or null
The HTTP code of the response.