Restore Project Version

Restores a Project to the state it was in at a specific Version in time. If successful, all changes made to the Project since this Version will be undone and the Project will return to its former state.

Authentication

AuthorizationBearer

Bearer authentication of the form Bearer <token>, where token is your auth token.

Path parameters

projectIdstringRequiredformat: "uuid"
The unique identifier of the Project to restore
versionintegerRequired
The version number to restore to

Headers

x-integration-namestringOptional
The name of the calling system passed along as a header parameter

Response

Success
errorobject or null
If the API call failed, this will contain information about the error that occurred.
successboolean or null

True if the API call succeeded; false otherwise.

hasErrorboolean or null
True if the API call failed.
statusCodeenum or null
The HTTP code of the response.
dataobject or null
This is the projectId being restored to