Retrieve Workspaces

GET

Retrieve the list of Workspaces to which the currently logged on user has access.

A single User may have access to multiple Workspaces, although they can only be logged on to one Workspace at a time. This API lists all Workspaces to which the currently logged on user is entitled to access. To determine which Workspace a user is currently logged on use the /api/data/me endpoint.

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

datalist of objectsOptional

If the API call succeeded, this will contain the results.

Built with