Invite to Workspace

POST

Invite a specific user to join a Workspace to which the current user has administrator rights.

A single User may have access to multiple Workspaces, although they can only be logged on to one Workspace at a time. This API lists all Workspaces to which the currently logged on user is entitled to access. To determine which Workspace a user is currently logged on use the /api/data/me endpoint.

This API allows you to invite a specific an invitation to join a specific Workspace.

Path parameters

organizationIdstringRequired

The unique identifier of the Organization that you are inviting a User to joi

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Request

This endpoint expects an object.
businessUserIdstringOptional

The unique identifier of the BusinessUser to invite to this Workspace.

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

Built with