Retrieve Task Field Value

Deprecated
GET

This endpoint has been replace with tasks/{taskId}/fields/{fieldId}/values

Path parameters

taskIdstringRequired

The unique identifier of the Task of the value to retrieve

fieldIdstringRequired

The unique identifier of the TaskField of the value to retrieve

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

A model that contains the value for a TaskField.

Built with