Retrieve All Task Field Values

Deprecated
GET

This endpoint has been replace with tasks/{taskId}/fields/{fieldId}/values

Path parameters

taskIdstringRequired

The unique identifier of the Task for which we want TaskField values

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

datalist of objectsOptional

If the API call succeeded, this will contain the results.

Built with