Replace Task Assignees

POST

Replace all TaskAssignees on a Task with new TaskAssignees.

A TaskAssignee is an assignment of a Resource to a Task. You can assign multiple Resources to a Task and designate how much of their time will be allocated to this Task.

In the request body, id is the id of the Resource you would like to assign to the Task, and assignedEffort is the amount of time that Resource is expected to spend on the task. assignedEffort should be entered in minutes.

Path parameters

taskIdstringRequired

The unique identifier of the Task whose TaskAssignees will be replaced

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Request

This endpoint expects a list of objects.
idstringRequired

The unique identifier of the TaskAssignee to which work is being assigned.

assignedEffortintegerOptional>=0<=2147483647

The new amount of effort to assign for this Resource. This value is measured in minutes.

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

Returns the id of a specific ChangeSet

Built with