Update Resource Team

PUT

Update a Resource Team.

Path parameters

teamresourceIdstringRequired

The id of the resource team

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Request

This endpoint expects an object.
namestringRequired=1 character

The name of this Resource Team.

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

A ResourceTeam is a group of Resources that can be referred to as a group. You can use a ResourceTeam as a shortcut to quickly assign or allocate multiple Resources quickly.

Built with