Create Resource Team

POST

Create a Resource Team.

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Request

This endpoint expects an object.
namestringRequired=1 character

The name of this Team.

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

A ResourceTeam is a group of Resources that can be referred to as a group. You can use a ResourceTeam as a shortcut to quickly assign or allocate multiple Resources quickly.

Built with