Retrieves all ResourceSkills defined within your Workspace.
A ResourceSkill is a capability possessed by a Resource that can be used to distinguish different classes of Resources suitable for use by a Task. You can specify that a Task requires a Resource with a particular set of ResourceSkills and then allocate Resources based on whether or not they have the suitable ResourceSkills.
The name of the calling system passed along as a header parameter
The number of records to return
Skips the given number of records and then returns $top records
Filter the expression according to oData queries
Order collection by this field.
Include related data in the response
Success
If the API call failed, this will contain information about the error that occurred.
True if the API call succeeded; false otherwise.
True if the API call failed.
The HTTP code of the response.
If the API call succeeded, this will contain the results.