Retrieve User Project Membership

GET

Returns the project security role in a specified project for a current project member.

A project member is a user who has access to a specific project. Project members are assigned a project security role, which controls the level of access they have to the project. Possible project security roles include manage, edit, collaborate, creator, and guest.

Path parameters

projectIdstringRequired

Reference of Project

userIdstringRequired

Reference of User

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

A ProjectMember is a user who can collaborate on a Project. You can control permissions for what each ProjectMember can do and how they can interact with the Project using this model.

Built with