Retrieve Project Members

GET

Returns a list of users that are currently members of a specified project, as well as their current project security roles and available project security roles. Optionally include users who are not currently members of the project, but who are available to be added.

A project member is a user who has access to a specific project. Project members are assigned a project security role, which controls the level of access they have to the project. Possible project security roles include manage, edit, collaborate, creator, and guest.

Path parameters

projectIdstringRequired

Reference to the project

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Query parameters

includeAllUsersbooleanOptional

Set to true to include all users in the workspace

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

datalist of objectsOptional

If the API call succeeded, this will contain the results.

Built with