Remove User Project Membership

DELETE

Removes a current project member from a specified project. This removes the user’s access to that project.

A project member is a user who has access to a specific project. Project members are assigned a project security role, which controls the level of access they have to the project. Possible project security roles include manage, edit, collaborate, creator, and guest.

Path parameters

projectIdstringRequired

Reference to Project

userIdstringRequired

Reference to User

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

Built with