Upload Project File To Folder

POST

Uploads a file to a specific folder on the Files page within the project that you specify.

ProjectManager allows you to store Files connected to other elements of your Workspace such as a Project, a Task, or Home. Files are maintained separately based on the location where the file was stored.

You can organize your files in the Home Files and Project Files pages by adding folders.

When you upload a File, please allow a few moments for the File to be processed and verified. ProjectManager may reject File uploads that contain problems such as malware. Once a File has completed the upload the process, you may retrieve it using the DownloadFile API.

This API returns a JSON response indicating success or failure.

Path parameters

projectIdstringRequired

The reference to the project

folderIdstringRequired

The reference to the sub folder to put the file into

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Request

This endpoint expects a multipart form containing an optional file.
filefileOptional

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

Represents a file in project manager

Built with