Retrieve Me

GET

Retrieve information about the currently logged on user.

This API call will always succeed with a 200 OK if called with valid authentication information. If the authentication information provided is not valid, calling this API will return a 401 Authentication Failed error message. If successful, this API returns information about the user including its home URL, email address, user name, and workspace name.

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

dataobjectOptional

Information about a currently logged in user.

You can call the RetrieveMe API to gather information about the current user.

Built with