Retrieve Changesets by project ID

Deprecated
GET

Retrieve Changesets by Project ID

Path parameters

projectIdstringRequired

The unique identifier of the Project for which you want to retrieve changesets

Headers

x-integration-namestringOptional

The name of the calling system passed along as a header parameter

Query parameters

versionintegerOptional

The version of the Project for which you want to retrieve changesets

pageintegerOptional

For pagination, the number of the page to retrieve

takeintegerOptional

For pagination, the size of the page

Response

Success

errorobjectOptional

If the API call failed, this will contain information about the error that occurred.

successbooleanOptional

True if the API call succeeded; false otherwise.

hasErrorbooleanOptional

True if the API call failed.

statusCodeenumOptional

The HTTP code of the response.

datalist of objectsOptional

If the API call succeeded, this will contain the results.

Built with