> For clean Markdown of any page, append .md to the page URL.
> For a complete documentation index, see https://developer.projectmanager.com/llms.txt.
> For AI client integration (Claude Code, Cursor, etc.), connect to the MCP server at https://developer.projectmanager.com/_mcp/server.

# Upload Project File

POST https://api.projectmanager.com/api/data/projects/{projectId}/files
Content-Type: multipart/form-data

Uploads a file to the All Files folder on the Files page within the project that you specify.
            
ProjectManager allows you to store Files connected to other elements of your Workspace
such as a Project, a Task, or Home.  Files are maintained separately based on the location
where the file was stored.
            
When you upload a File, please allow a few moments for the File to be processed and verified.
ProjectManager may reject File uploads that contain problems such as malware. Once a File has
completed the upload the process, you may retrieve it using the DownloadFile API.
            
This API returns a JSON response indicating success or failure.

Reference: https://developer.projectmanager.com/api-reference/project-file/upload-project-file

## Authentication

- `Authorization` header (bearer token, required) — Bearer authentication of the form `Bearer <token>`, where token is your auth token.

## Request

### Path parameters

- `projectId` (string, required) — The reference to the project

### Headers

- `x-integration-name` (string, optional) — The name of the calling system passed along as a header parameter

### Body (multipart/form-data)

This endpoint expects a multipart form containing an optional file.

- `file` (file, optional)

## Response

### 200

Success

- `error` (AstroError, optional, nullable) — If the API call failed, this will contain information about the error that occurred.
- `success` (boolean, optional) — True if the API call succeeded; false otherwise.
- `hasError` (boolean, optional) — True if the API call failed.
- `statusCode` (enum, optional) — The HTTP code of the response.
  - Allowed values: `Continue`, `SwitchingProtocols`, `Processing`, `EarlyHints`, `OK`, `Created`, `Accepted`, `NonAuthoritativeInformation`, `NoContent`, `ResetContent`, `PartialContent`, `MultiStatus`, `AlreadyReported`, `IMUsed`, `MultipleChoices`, `MovedPermanently`, `Found`, `SeeOther`, `NotModified`, `UseProxy`, `Unused`, `TemporaryRedirect`, `PermanentRedirect`, `BadRequest`, `Unauthorized`, `PaymentRequired`, `Forbidden`, `NotFound`, `MethodNotAllowed`, `NotAcceptable`, `ProxyAuthenticationRequired`, `RequestTimeout`, `Conflict`, `Gone`, `LengthRequired`, `PreconditionFailed`, `RequestEntityTooLarge`, `RequestUriTooLong`, `UnsupportedMediaType`, `RequestedRangeNotSatisfiable`, `ExpectationFailed`, `MisdirectedRequest`, `UnprocessableEntity`, `Locked`, `FailedDependency`, `UpgradeRequired`, `PreconditionRequired`, `TooManyRequests`, `RequestHeaderFieldsTooLarge`, `UnavailableForLegalReasons`, `InternalServerError`, `NotImplemented`, `BadGateway`, `ServiceUnavailable`, `GatewayTimeout`, `HttpVersionNotSupported`, `VariantAlsoNegotiates`, `InsufficientStorage`, `LoopDetected`, `NotExtended`, `NetworkAuthenticationRequired`
- `data` (FileDto, optional) — Represents a file in project manager

## Types

### AstroError

Information about an error that occurred within the ProjectManager API.

- `technicalError` (string, optional, nullable) — A technical description of the error that occurred. Not suitable for display to end users.
- `additionalErrors` (list of string, optional, nullable) — If additional errors beyond the main error in `Message` occurred, they will be listed here as individual messages.
- `validationErrors` (map from string to list of string, optional, nullable) — This contains a dictionary of validation errors. The key is the name of the field
- `message` (string, optional, nullable) — A description of the error that occurred. If your application has a user interface, show this message to explain what went wrong.

### FileDto

Represents a file in project manager

- `id` (string, optional) — The identifier for this file
- `projectId` (string, optional, nullable) — If specified this file belongs to a project. The value is the id of this project
- `taskId` (string, optional, nullable) — If specified, the file has been associated with this task.
- `ownerId` (string, optional) — The reference for who uploaded the file
- `createdDate` (string, optional) — The UTC time the file was created.
- `folderId` (string, optional) — A reference to the folder
- `fileType` (string, optional) — The type of the file
- `fileTypeLabel` (string, optional) — A user friendly label for the file type
- `size` (integer, optional) — Size of the file in bytes
- `downloadPath` (string, optional) — Path to download the file
- `deleted` (boolean, optional) — Is the file in the trash can
- `type` (string, optional) — Defines the object type the file belongs to.
- `name` (string, optional) — The name of the file
- `entityOwnerId` (string, optional) — Id of owner of parent entity

## Examples

**Request**

```json
{
  "file": "<file: [object Object]>"
}
```

**Response**

```json
{
  "error": {
    "technicalError": "string",
    "additionalErrors": [
      "string"
    ],
    "validationErrors": {},
    "message": "string"
  },
  "success": true,
  "hasError": true,
  "statusCode": "Continue",
  "data": {
    "id": "string",
    "projectId": "string",
    "taskId": "string",
    "ownerId": "string",
    "createdDate": "2024-01-15T09:30:00Z",
    "folderId": "string",
    "fileType": "string",
    "fileTypeLabel": "string",
    "size": 1,
    "downloadPath": "string",
    "deleted": true,
    "type": "string",
    "name": "string",
    "entityOwnerId": "string"
  }
}
```

**SDK Code**

```python
import requests

url = "https://api.projectmanager.com/api/data/projects/projectId/files"

files = { "file": "open('[object Object]', 'rb')" }
headers = {"Authorization": "Bearer <token>"}

response = requests.post(url, files=files, headers=headers)

print(response.json())
```

```javascript
const url = 'https://api.projectmanager.com/api/data/projects/projectId/files';
const form = new FormData();
form.append('file', '[object Object]');

const options = {method: 'POST', headers: {Authorization: 'Bearer <token>'}};

options.body = form;

try {
  const response = await fetch(url, options);
  const data = await response.json();
  console.log(data);
} catch (error) {
  console.error(error);
}
```

```go
package main

import (
	"fmt"
	"strings"
	"net/http"
	"io"
)

func main() {

	url := "https://api.projectmanager.com/api/data/projects/projectId/files"

	payload := strings.NewReader("-----011000010111000001101001\r\nContent-Disposition: form-data; name=\"file\"; filename=\"[object Object]\"\r\nContent-Type: application/octet-stream\r\n\r\n\r\n-----011000010111000001101001--\r\n")

	req, _ := http.NewRequest("POST", url, payload)

	req.Header.Add("Authorization", "Bearer <token>")

	res, _ := http.DefaultClient.Do(req)

	defer res.Body.Close()
	body, _ := io.ReadAll(res.Body)

	fmt.Println(res)
	fmt.Println(string(body))

}
```

```ruby
require 'uri'
require 'net/http'

url = URI("https://api.projectmanager.com/api/data/projects/projectId/files")

http = Net::HTTP.new(url.host, url.port)
http.use_ssl = true

request = Net::HTTP::Post.new(url)
request["Authorization"] = 'Bearer <token>'
request.body = "-----011000010111000001101001\r\nContent-Disposition: form-data; name=\"file\"; filename=\"[object Object]\"\r\nContent-Type: application/octet-stream\r\n\r\n\r\n-----011000010111000001101001--\r\n"

response = http.request(request)
puts response.read_body
```

```java
import com.mashape.unirest.http.HttpResponse;
import com.mashape.unirest.http.Unirest;

HttpResponse<String> response = Unirest.post("https://api.projectmanager.com/api/data/projects/projectId/files")
  .header("Authorization", "Bearer <token>")
  .body("-----011000010111000001101001\r\nContent-Disposition: form-data; name=\"file\"; filename=\"[object Object]\"\r\nContent-Type: application/octet-stream\r\n\r\n\r\n-----011000010111000001101001--\r\n")
  .asString();
```

```php
<?php
require_once('vendor/autoload.php');

$client = new \GuzzleHttp\Client();

$response = $client->request('POST', 'https://api.projectmanager.com/api/data/projects/projectId/files', [
  'multipart' => [
    [
        'name' => 'file',
        'filename' => '[object Object]',
        'contents' => null
    ]
  ]
  'headers' => [
    'Authorization' => 'Bearer <token>',
  ],
]);

echo $response->getBody();
```

```csharp
using RestSharp;

var client = new RestClient("https://api.projectmanager.com/api/data/projects/projectId/files");
var request = new RestRequest(Method.POST);
request.AddHeader("Authorization", "Bearer <token>");
request.AddParameter("undefined", "-----011000010111000001101001\r\nContent-Disposition: form-data; name=\"file\"; filename=\"[object Object]\"\r\nContent-Type: application/octet-stream\r\n\r\n\r\n-----011000010111000001101001--\r\n", ParameterType.RequestBody);
IRestResponse response = client.Execute(request);
```

```swift
import Foundation

let headers = ["Authorization": "Bearer <token>"]
let parameters = [
  [
    "name": "file",
    "fileName": "[object Object]"
  ]
]

let boundary = "---011000010111000001101001"

var body = ""
var error: NSError? = nil
for param in parameters {
  let paramName = param["name"]!
  body += "--\(boundary)\r\n"
  body += "Content-Disposition:form-data; name=\"\(paramName)\""
  if let filename = param["fileName"] {
    let contentType = param["content-type"]!
    let fileContent = String(contentsOfFile: filename, encoding: String.Encoding.utf8)
    if (error != nil) {
      print(error as Any)
    }
    body += "; filename=\"\(filename)\"\r\n"
    body += "Content-Type: \(contentType)\r\n\r\n"
    body += fileContent
  } else if let paramValue = param["value"] {
    body += "\r\n\r\n\(paramValue)"
  }
}

let request = NSMutableURLRequest(url: NSURL(string: "https://api.projectmanager.com/api/data/projects/projectId/files")! as URL,
                                        cachePolicy: .useProtocolCachePolicy,
                                    timeoutInterval: 10.0)
request.httpMethod = "POST"
request.allHTTPHeaderFields = headers
request.httpBody = postData as Data

let session = URLSession.shared
let dataTask = session.dataTask(with: request as URLRequest, completionHandler: { (data, response, error) -> Void in
  if (error != nil) {
    print(error as Any)
  } else {
    let httpResponse = response as? HTTPURLResponse
    print(httpResponse)
  }
})

dataTask.resume()
```