> For clean Markdown of any page, append .md to the page URL.
> For a complete documentation index, see https://developer.projectmanager.com/llms.txt.
> For AI client integration (Claude Code, Cursor, etc.), connect to the MCP server at https://developer.projectmanager.com/_mcp/server.

# Add TaskTag to Task

PUT https://api.projectmanager.com/api/data/non-project-tasks/{taskId}/tags
Content-Type: application/json

Add one or more new TaskTags to a Task.
            
A TaskTag is a connection between a Task and a Tag.  Each Task can have zero, one or many
TaskTags associated with it.  TaskTags can be assigned and removed from the Task to help you
classify your Tasks and prioritize work.

Reference: https://developer.projectmanager.com/api-reference/npt-tag/add-task-tag-to-task

## Authentication

- `Authorization` header (bearer token, required) — Bearer authentication of the form `Bearer <token>`, where token is your auth token.

## Request

### Path parameters

- `taskId` (string, required) — The unique identifier of the Task for which we will add TaskTags

### Headers

- `x-integration-name` (string, optional) — The name of the calling system passed along as a header parameter

### Body (application/json)

This endpoint expects a list of NameDto.

- `list of NameDto`

## Response

### 200

Success

- `error` (AstroError, optional, nullable) — If the API call failed, this will contain information about the error that occurred.
- `success` (boolean, optional) — True if the API call succeeded; false otherwise.
- `hasError` (boolean, optional) — True if the API call failed.
- `statusCode` (enum, optional) — The HTTP code of the response.
  - Allowed values: `Continue`, `SwitchingProtocols`, `Processing`, `EarlyHints`, `OK`, `Created`, `Accepted`, `NonAuthoritativeInformation`, `NoContent`, `ResetContent`, `PartialContent`, `MultiStatus`, `AlreadyReported`, `IMUsed`, `MultipleChoices`, `MovedPermanently`, `Found`, `SeeOther`, `NotModified`, `UseProxy`, `Unused`, `TemporaryRedirect`, `PermanentRedirect`, `BadRequest`, `Unauthorized`, `PaymentRequired`, `Forbidden`, `NotFound`, `MethodNotAllowed`, `NotAcceptable`, `ProxyAuthenticationRequired`, `RequestTimeout`, `Conflict`, `Gone`, `LengthRequired`, `PreconditionFailed`, `RequestEntityTooLarge`, `RequestUriTooLong`, `UnsupportedMediaType`, `RequestedRangeNotSatisfiable`, `ExpectationFailed`, `MisdirectedRequest`, `UnprocessableEntity`, `Locked`, `FailedDependency`, `UpgradeRequired`, `PreconditionRequired`, `TooManyRequests`, `RequestHeaderFieldsTooLarge`, `UnavailableForLegalReasons`, `InternalServerError`, `NotImplemented`, `BadGateway`, `ServiceUnavailable`, `GatewayTimeout`, `HttpVersionNotSupported`, `VariantAlsoNegotiates`, `InsufficientStorage`, `LoopDetected`, `NotExtended`, `NetworkAuthenticationRequired`
- `data` (list of TaskTagDto, optional) — If the API call succeeded, this will contain the results.

## Types

### NameDto

When uploading a list of names to an API, this data structure represents an individual name within the list.

- `name` (string, required) — A name. To determine the meaning of this name, see the field to which this value is attached in the parent object.

### AstroError

Information about an error that occurred within the ProjectManager API.

- `technicalError` (string, optional, nullable) — A technical description of the error that occurred. Not suitable for display to end users.
- `additionalErrors` (list of string, optional, nullable) — If additional errors beyond the main error in `Message` occurred, they will be listed here as individual messages.
- `validationErrors` (map from string to list of string, optional, nullable) — This contains a dictionary of validation errors. The key is the name of the field
- `message` (string, optional, nullable) — A description of the error that occurred. If your application has a user interface, show this message to explain what went wrong.

### TaskTagDto

A TaskTag is a connection between a Task and a Tag. Each Task can have zero, one or many TaskTags associated with it. TaskTags can be assigned and removed from the Task to help you classify your Tasks and prioritize work.

- `id` (string, optional) — The unique identifier of this TaskTag.
- `name` (string, optional) — The common name of this TaskTag.
- `color` (string, optional) — The color that will be used to represent this Tag visually. This color is automatically chosen by the application when a user creates a Tag. You can choose specify any color that can be represented using HTML RGB syntax such as `#0088FF`, in the format `RRGGBB`. You may not use names for colors.

## Examples

**Request**

```json
[
  {
    "name": "string"
  }
]
```

**Response**

```json
{
  "error": {
    "technicalError": "string",
    "additionalErrors": [
      "string"
    ],
    "validationErrors": {},
    "message": "string"
  },
  "success": true,
  "hasError": true,
  "statusCode": "Continue",
  "data": [
    {
      "id": "string",
      "name": "string",
      "color": "string"
    }
  ]
}
```

**SDK Code**

```python
import requests

url = "https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags"

payload = [{ "name": "string" }]
headers = {
    "Authorization": "Bearer <token>",
    "Content-Type": "application/json"
}

response = requests.put(url, json=payload, headers=headers)

print(response.json())
```

```javascript
const url = 'https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags';
const options = {
  method: 'PUT',
  headers: {Authorization: 'Bearer <token>', 'Content-Type': 'application/json'},
  body: '[{"name":"string"}]'
};

try {
  const response = await fetch(url, options);
  const data = await response.json();
  console.log(data);
} catch (error) {
  console.error(error);
}
```

```go
package main

import (
	"fmt"
	"strings"
	"net/http"
	"io"
)

func main() {

	url := "https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags"

	payload := strings.NewReader("[\n  {\n    \"name\": \"string\"\n  }\n]")

	req, _ := http.NewRequest("PUT", url, payload)

	req.Header.Add("Authorization", "Bearer <token>")
	req.Header.Add("Content-Type", "application/json")

	res, _ := http.DefaultClient.Do(req)

	defer res.Body.Close()
	body, _ := io.ReadAll(res.Body)

	fmt.Println(res)
	fmt.Println(string(body))

}
```

```ruby
require 'uri'
require 'net/http'

url = URI("https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags")

http = Net::HTTP.new(url.host, url.port)
http.use_ssl = true

request = Net::HTTP::Put.new(url)
request["Authorization"] = 'Bearer <token>'
request["Content-Type"] = 'application/json'
request.body = "[\n  {\n    \"name\": \"string\"\n  }\n]"

response = http.request(request)
puts response.read_body
```

```java
import com.mashape.unirest.http.HttpResponse;
import com.mashape.unirest.http.Unirest;

HttpResponse<String> response = Unirest.put("https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags")
  .header("Authorization", "Bearer <token>")
  .header("Content-Type", "application/json")
  .body("[\n  {\n    \"name\": \"string\"\n  }\n]")
  .asString();
```

```php
<?php
require_once('vendor/autoload.php');

$client = new \GuzzleHttp\Client();

$response = $client->request('PUT', 'https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags', [
  'body' => '[
  {
    "name": "string"
  }
]',
  'headers' => [
    'Authorization' => 'Bearer <token>',
    'Content-Type' => 'application/json',
  ],
]);

echo $response->getBody();
```

```csharp
using RestSharp;

var client = new RestClient("https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags");
var request = new RestRequest(Method.PUT);
request.AddHeader("Authorization", "Bearer <token>");
request.AddHeader("Content-Type", "application/json");
request.AddParameter("application/json", "[\n  {\n    \"name\": \"string\"\n  }\n]", ParameterType.RequestBody);
IRestResponse response = client.Execute(request);
```

```swift
import Foundation

let headers = [
  "Authorization": "Bearer <token>",
  "Content-Type": "application/json"
]
let parameters = [["name": "string"]] as [String : Any]

let postData = JSONSerialization.data(withJSONObject: parameters, options: [])

let request = NSMutableURLRequest(url: NSURL(string: "https://api.projectmanager.com/api/data/non-project-tasks/taskId/tags")! as URL,
                                        cachePolicy: .useProtocolCachePolicy,
                                    timeoutInterval: 10.0)
request.httpMethod = "PUT"
request.allHTTPHeaderFields = headers
request.httpBody = postData as Data

let session = URLSession.shared
let dataTask = session.dataTask(with: request as URLRequest, completionHandler: { (data, response, error) -> Void in
  if (error != nil) {
    print(error as Any)
  } else {
    let httpResponse = response as? HTTPURLResponse
    print(httpResponse)
  }
})

dataTask.resume()
```