> For clean Markdown of any page, append .md to the page URL. > For a complete documentation index, see https://developer.projectmanager.com/api-reference/integration-provider/update-user-integration-provider-connection/llms.txt. > For AI client integration (Claude Code, Cursor, etc.), connect to the MCP server at https://developer.projectmanager.com/_mcp/server. # Update User Integration Provider Connection PUT https://api.projectmanager.com/api/data/integrations/providers/{providerId}/user-connection Content-Type: application/json Allows you to update the auth status of the provider specific user connection. An IntegrationProvider is the name of an external application or service that can be connected to ProjectManager.com. The Integrations API is intended for use by ProjectManager and its business development partners. Please contact ProjectManager's sales team to request use of this API. Reference: https://developer.projectmanager.com/api-reference/integration-provider/update-user-integration-provider-connection ## Authentication - `Authorization` header (bearer token, required) — Bearer authentication of the form `Bearer `, where token is your auth token. ## Request ### Path parameters - `providerId` (string, required) — The identifier to the provider ### Headers - `x-integration-name` (string, optional) — The name of the calling system passed along as a header parameter ### Body (application/json) This endpoint expects an AuthenticationDto. - `connected` (boolean, optional) — Set to true if the connection was successful. False is not supported right now. - `authScheme` (map from string to any, optional, nullable) — Authenication scheme ## Response ### 200 Success - `error` (AstroError, optional, nullable) — If the API call failed, this will contain information about the error that occurred. - `success` (boolean, optional) — True if the API call succeeded; false otherwise. - `hasError` (boolean, optional) — True if the API call failed. - `statusCode` (enum, optional) — The HTTP code of the response. - Allowed values: `Continue`, `SwitchingProtocols`, `Processing`, `EarlyHints`, `OK`, `Created`, `Accepted`, `NonAuthoritativeInformation`, `NoContent`, `ResetContent`, `PartialContent`, `MultiStatus`, `AlreadyReported`, `IMUsed`, `MultipleChoices`, `MovedPermanently`, `Found`, `SeeOther`, `NotModified`, `UseProxy`, `Unused`, `TemporaryRedirect`, `PermanentRedirect`, `BadRequest`, `Unauthorized`, `PaymentRequired`, `Forbidden`, `NotFound`, `MethodNotAllowed`, `NotAcceptable`, `ProxyAuthenticationRequired`, `RequestTimeout`, `Conflict`, `Gone`, `LengthRequired`, `PreconditionFailed`, `RequestEntityTooLarge`, `RequestUriTooLong`, `UnsupportedMediaType`, `RequestedRangeNotSatisfiable`, `ExpectationFailed`, `MisdirectedRequest`, `UnprocessableEntity`, `Locked`, `FailedDependency`, `UpgradeRequired`, `PreconditionRequired`, `TooManyRequests`, `RequestHeaderFieldsTooLarge`, `UnavailableForLegalReasons`, `InternalServerError`, `NotImplemented`, `BadGateway`, `ServiceUnavailable`, `GatewayTimeout`, `HttpVersionNotSupported`, `VariantAlsoNegotiates`, `InsufficientStorage`, `LoopDetected`, `NotExtended`, `NetworkAuthenticationRequired` ## Types ### AstroError Information about an error that occurred within the ProjectManager API. - `technicalError` (string, optional, nullable) — A technical description of the error that occurred. Not suitable for display to end users. - `additionalErrors` (list of string, optional, nullable) — If additional errors beyond the main error in `Message` occurred, they will be listed here as individual messages. - `validationErrors` (map from string to list of string, optional, nullable) — This contains a dictionary of validation errors. The key is the name of the field - `message` (string, optional, nullable) — A description of the error that occurred. If your application has a user interface, show this message to explain what went wrong. ## Examples **Request** ```json {} ``` **Response** ```json { "error": { "technicalError": "string", "additionalErrors": [ "string" ], "validationErrors": {}, "message": "string" }, "success": true, "hasError": true, "statusCode": "Continue" } ``` **SDK Code** ```python import requests url = "https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection" payload = {} headers = { "Authorization": "Bearer ", "Content-Type": "application/json" } response = requests.put(url, json=payload, headers=headers) print(response.json()) ``` ```javascript const url = 'https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection'; const options = { method: 'PUT', headers: {Authorization: 'Bearer ', 'Content-Type': 'application/json'}, body: '{}' }; try { const response = await fetch(url, options); const data = await response.json(); console.log(data); } catch (error) { console.error(error); } ``` ```go package main import ( "fmt" "strings" "net/http" "io" ) func main() { url := "https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection" payload := strings.NewReader("{}") req, _ := http.NewRequest("PUT", url, payload) req.Header.Add("Authorization", "Bearer ") req.Header.Add("Content-Type", "application/json") res, _ := http.DefaultClient.Do(req) defer res.Body.Close() body, _ := io.ReadAll(res.Body) fmt.Println(res) fmt.Println(string(body)) } ``` ```ruby require 'uri' require 'net/http' url = URI("https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection") http = Net::HTTP.new(url.host, url.port) http.use_ssl = true request = Net::HTTP::Put.new(url) request["Authorization"] = 'Bearer ' request["Content-Type"] = 'application/json' request.body = "{}" response = http.request(request) puts response.read_body ``` ```java import com.mashape.unirest.http.HttpResponse; import com.mashape.unirest.http.Unirest; HttpResponse response = Unirest.put("https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection") .header("Authorization", "Bearer ") .header("Content-Type", "application/json") .body("{}") .asString(); ``` ```php request('PUT', 'https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection', [ 'body' => '{}', 'headers' => [ 'Authorization' => 'Bearer ', 'Content-Type' => 'application/json', ], ]); echo $response->getBody(); ``` ```csharp using RestSharp; var client = new RestClient("https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection"); var request = new RestRequest(Method.PUT); request.AddHeader("Authorization", "Bearer "); request.AddHeader("Content-Type", "application/json"); request.AddParameter("application/json", "{}", ParameterType.RequestBody); IRestResponse response = client.Execute(request); ``` ```swift import Foundation let headers = [ "Authorization": "Bearer ", "Content-Type": "application/json" ] let parameters = [] as [String : Any] let postData = JSONSerialization.data(withJSONObject: parameters, options: []) let request = NSMutableURLRequest(url: NSURL(string: "https://api.projectmanager.com/api/data/integrations/providers/providerId/user-connection")! as URL, cachePolicy: .useProtocolCachePolicy, timeoutInterval: 10.0) request.httpMethod = "PUT" request.allHTTPHeaderFields = headers request.httpBody = postData as Data let session = URLSession.shared let dataTask = session.dataTask(with: request as URLRequest, completionHandler: { (data, response, error) -> Void in if (error != nil) { print(error as Any) } else { let httpResponse = response as? HTTPURLResponse print(httpResponse) } }) dataTask.resume() ```