> For clean Markdown of any page, append .md to the page URL.
> For a complete documentation index, see https://developer.projectmanager.com/llms.txt.
> For AI client integration (Claude Code, Cursor, etc.), connect to the MCP server at https://developer.projectmanager.com/_mcp/server.

# Get States

GET https://api.projectmanager.com/api/data/countries/{isoCode}/states

This method returns a list of all states for the specified country as defined by [ISO3166](https://www.iso.org/iso-3166-country-codes.html).
Note that many countries may have administrative regions although not all countries require administrative
regions to be used when specifying an address.
            
Each state includes its unique identifier, state code, and name.

Reference: https://developer.projectmanager.com/api-reference/country/get-states

## Authentication

- `Authorization` header (bearer token, required) — Bearer authentication of the form `Bearer <token>`, where token is your auth token.

## Request

### Path parameters

- `isoCode` (string, required) — The ISO-3166-2 code of the country

### Headers

- `x-integration-name` (string, optional) — The name of the calling system passed along as a header parameter

## Response

### 200

Success

- `error` (AstroError, optional, nullable) — If the API call failed, this will contain information about the error that occurred.
- `success` (boolean, optional) — True if the API call succeeded; false otherwise.
- `hasError` (boolean, optional) — True if the API call failed.
- `statusCode` (enum, optional) — The HTTP code of the response.
  - Allowed values: `Continue`, `SwitchingProtocols`, `Processing`, `EarlyHints`, `OK`, `Created`, `Accepted`, `NonAuthoritativeInformation`, `NoContent`, `ResetContent`, `PartialContent`, `MultiStatus`, `AlreadyReported`, `IMUsed`, `MultipleChoices`, `MovedPermanently`, `Found`, `SeeOther`, `NotModified`, `UseProxy`, `Unused`, `TemporaryRedirect`, `PermanentRedirect`, `BadRequest`, `Unauthorized`, `PaymentRequired`, `Forbidden`, `NotFound`, `MethodNotAllowed`, `NotAcceptable`, `ProxyAuthenticationRequired`, `RequestTimeout`, `Conflict`, `Gone`, `LengthRequired`, `PreconditionFailed`, `RequestEntityTooLarge`, `RequestUriTooLong`, `UnsupportedMediaType`, `RequestedRangeNotSatisfiable`, `ExpectationFailed`, `MisdirectedRequest`, `UnprocessableEntity`, `Locked`, `FailedDependency`, `UpgradeRequired`, `PreconditionRequired`, `TooManyRequests`, `RequestHeaderFieldsTooLarge`, `UnavailableForLegalReasons`, `InternalServerError`, `NotImplemented`, `BadGateway`, `ServiceUnavailable`, `GatewayTimeout`, `HttpVersionNotSupported`, `VariantAlsoNegotiates`, `InsufficientStorage`, `LoopDetected`, `NotExtended`, `NetworkAuthenticationRequired`
- `data` (list of StateDto, optional) — If the API call succeeded, this will contain the results.

## Types

### AstroError

Information about an error that occurred within the ProjectManager API.

- `technicalError` (string, optional, nullable) — A technical description of the error that occurred. Not suitable for display to end users.
- `additionalErrors` (list of string, optional, nullable) — If additional errors beyond the main error in `Message` occurred, they will be listed here as individual messages.
- `validationErrors` (map from string to list of string, optional, nullable) — This contains a dictionary of validation errors. The key is the name of the field
- `message` (string, optional, nullable) — A description of the error that occurred. If your application has a user interface, show this message to explain what went wrong.

### StateDto

Represents a state with its details.

- `id` (integer, optional) — Gets or sets the unique identifier for the state.
- `stateCode` (string, optional) — Gets or sets the code of the state.
- `name` (string, optional) — Gets or sets the name of the state.

## Examples

**Response**

```json
{
  "error": {
    "technicalError": "string",
    "additionalErrors": [
      "string"
    ],
    "validationErrors": {},
    "message": "string"
  },
  "success": true,
  "hasError": true,
  "statusCode": "Continue",
  "data": [
    {
      "id": 1,
      "stateCode": "string",
      "name": "string"
    }
  ]
}
```

**SDK Code**

```python
import requests

url = "https://api.projectmanager.com/api/data/countries/isoCode/states"

headers = {"Authorization": "Bearer <token>"}

response = requests.get(url, headers=headers)

print(response.json())
```

```javascript
const url = 'https://api.projectmanager.com/api/data/countries/isoCode/states';
const options = {method: 'GET', headers: {Authorization: 'Bearer <token>'}};

try {
  const response = await fetch(url, options);
  const data = await response.json();
  console.log(data);
} catch (error) {
  console.error(error);
}
```

```go
package main

import (
	"fmt"
	"net/http"
	"io"
)

func main() {

	url := "https://api.projectmanager.com/api/data/countries/isoCode/states"

	req, _ := http.NewRequest("GET", url, nil)

	req.Header.Add("Authorization", "Bearer <token>")

	res, _ := http.DefaultClient.Do(req)

	defer res.Body.Close()
	body, _ := io.ReadAll(res.Body)

	fmt.Println(res)
	fmt.Println(string(body))

}
```

```ruby
require 'uri'
require 'net/http'

url = URI("https://api.projectmanager.com/api/data/countries/isoCode/states")

http = Net::HTTP.new(url.host, url.port)
http.use_ssl = true

request = Net::HTTP::Get.new(url)
request["Authorization"] = 'Bearer <token>'

response = http.request(request)
puts response.read_body
```

```java
import com.mashape.unirest.http.HttpResponse;
import com.mashape.unirest.http.Unirest;

HttpResponse<String> response = Unirest.get("https://api.projectmanager.com/api/data/countries/isoCode/states")
  .header("Authorization", "Bearer <token>")
  .asString();
```

```php
<?php
require_once('vendor/autoload.php');

$client = new \GuzzleHttp\Client();

$response = $client->request('GET', 'https://api.projectmanager.com/api/data/countries/isoCode/states', [
  'headers' => [
    'Authorization' => 'Bearer <token>',
  ],
]);

echo $response->getBody();
```

```csharp
using RestSharp;

var client = new RestClient("https://api.projectmanager.com/api/data/countries/isoCode/states");
var request = new RestRequest(Method.GET);
request.AddHeader("Authorization", "Bearer <token>");
IRestResponse response = client.Execute(request);
```

```swift
import Foundation

let headers = ["Authorization": "Bearer <token>"]

let request = NSMutableURLRequest(url: NSURL(string: "https://api.projectmanager.com/api/data/countries/isoCode/states")! as URL,
                                        cachePolicy: .useProtocolCachePolicy,
                                    timeoutInterval: 10.0)
request.httpMethod = "GET"
request.allHTTPHeaderFields = headers

let session = URLSession.shared
let dataTask = session.dataTask(with: request as URLRequest, completionHandler: { (data, response, error) -> Void in
  if (error != nil) {
    print(error as Any)
  } else {
    let httpResponse = response as? HTTPURLResponse
    print(httpResponse)
  }
})

dataTask.resume()
```